Project: Lance's_650B   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Lance Miller   -  
Project:   Zenair - CH 650 B   -   VIEW REPORTS
Total Hours:667.8
Start/Last Date:Dec 10, 2015 - No Finish Date
Engine:Corvair 2850
Propeller:Warp Drive
Panel:Probably steam gauge + iPad mini mount
 
Friendly URL: https://eaabuilderslog.org?s=Lance's_650B

Home or Last Project Picture

Jul 16, 2022     Nearly finished nose rib angles drills and finished drilling rear spar to rear rib - (3 hours)       Category: Wings
Nearly completed front rib angle drilling. I noticed that after drilling on rib angle for rib #3 that the second hole (top and bottom with equally spaced 7 holes) it placed the second hole too close (4mm only, need 6mm) to the edge of the 6W11-11. Therefore I drilled another hole about 8-10 mm further into the 6W11-17. I don't like the holes near the edge (I didn't drill through 6W11-11 yet, only 6W11-17, so i think i'll get another piece of 0.040 L channel and replace it. The same issue on Front Rib #2 so before drilling it, I drilled 10mm, 30mm (still only on 6W11-17), then the 3 center holes in the original pattern.
Lined up and drilled rear channel to rear ribs like HomebuildHelp suggested, all with final drill holes.


 